This paper reported the design progress of the music suite in Taipei National University of Arts. The 7,000-m3 concert hall was designed for orchestra performances and the occupied reverberation time (RT) was set to 1.7 s. A diffused and high ceiling was used to prevent from over-powering. The stage was restricted to 155 m2 to provide good support and balance. Tests in 1/20 model yielded an early support (ST1) of iV13.1 dB at the solo location. The 1,450-m3 orchestra rehearsal room was designed to provide both adequate reverberation and strength of co-players. This was achieved by implementing concentrated diffusers on a splayed ceiling or an array of overhead diffusers above the floor.
Authors:
Chiang, Weihwa; Yang, Liang Kuang; Jih, Wenling
Affiliation:
Department of Architecture, National Taiwan University of Science and Tech., Taiwan
AES Conference:
21st International Conference: Architectural Acoustics and Sound Reinforcement (June 2002)
Paper Number:
000138
Publication Date:
June 1, 2002
Subject:
Architectural Acoustics & Sound Reinforcement
Click to purchase paper as a non-member or you can login as an AES member to see more options.
No AES members have commented on this paper yet.
To be notified of new comments on this paper you can subscribe to this RSS feed. Forum users should login to see additional options.
If you are not yet an AES member and have something important to say about this paper then we urge you to join the AES today and make your voice heard. You can join online today by clicking here.